Delhi’s older industrial areas are dense, busy and short of space. Upgrading or adding a transformer there is as much about planning the plot and the paperwork as the kVA.

Industrial areas such as Okhla and Mayapuri in Delhi host printing presses, garment and export houses, packaging units and light engineering workshops. Many buildings are multi-storey, plots are small and access lanes are narrow. When such a unit grows beyond its existing supply, needs a dedicated transformer or has to replace an ageing one, the constraints are very different from a greenfield plot outside the city.
Typical loads
- Printing: offset and digital presses, UV and IR dryers, folders and binding machines, plus air conditioning for paper and ink stability.
- Garments: many small sewing machine motors, cutting machines, steam irons and boilers, finishing and packing.
- Light engineering: lathes, presses, welding sets and compressors.
- Building services: lifts, water pumps, air conditioning and lighting across several floors.
Printing presses and electronic controls are sensitive to voltage dips; welding and large motor starts can cause them. Keep these loads on separate feeders where possible and tell the supplier about them.
Space and access
On a small plot, the transformer location is often the hardest decision. Options include an outdoor plinth in the setback area, a compact substation, or a dry-type transformer in a ventilated room within the building where fire-safety rules and the utility allow it. Check the delivery route: narrow lanes, overhead wires and parked vehicles can make it difficult to bring in a transformer and a crane. Measure the route and share photographs with the supplier.
Working with the distribution utility
Delhi’s distribution companies set rules for new connections, load enhancement and consumer-owned substations, including metering arrangements. Engage with the utility early, obtain the approved scheme, and make sure the transformer specification and test documents meet what they will check at the time of energisation.
Replacing an old transformer
Many units in these areas still run transformers installed decades ago. Before replacing, collect the existing nameplate details and recent bills to understand the real load. A new unit with better efficiency and lower losses can reduce running costs, but the main benefit is reliability. Plan the changeover with the utility to keep the shutdown short, and confirm the new unit fits the existing plinth and cable arrangement or plan the changes in advance.
Information to send
- Address, plot dimensions and photographs of the proposed location and access lane.
- Load list or recent bills; sanctioned load and supply voltage.
- Existing transformer nameplate, if replacing.
- Utility correspondence or approved scheme, if available.
Jaybee Industries supplies transformers across Delhi NCR from its plants in Punjab, Haryana and Himachal. Offers are prepared on request; we do not publish prices.
Send your enquiry
Call toll-free 1800 309 9948, message us on WhatsApp at +91 98162 95407, or email info@jaybeeindustries.com. Mention this article and your site location so the right team responds. We reply with technical options; we do not publish prices, and every offer is prepared for your specification.
Related pages on this site
- Transformers for Delhi
- Distribution transformers
- Compact substations
- Delhi NCR locations
- Send an NCR enquiry
Request a quote Call 1800 309 9948 WhatsApp +91 98162 95407 info@jaybeeindustries.com